EN / About us / Press / News

News

31.10.2014

Gas flow from Ukraine is in normal mode

According to the state of this morning, related to transmission from East to the European Union, Eustream didn´t record pressure reduction or confirmed gas volumes decrease at the Compressor Station Veľké Kapušany on the border with Ukraine.

24.10.2014

Eustream launches capacities for the test period for the SK-HU Interconnector

Eustream would like to inform you that in cooperation with Magyar Gáz Tranzit ZRt. both parties have agreed for the purpose of testing to offer gas transmission capacities at the Slovak - Hungarian Interconnector.

11.09.2014

Gas flow is in line with nominations

Eustream has recorded changes in nominations. Reduced volumes, however, are pre-announced and confirmed by the nominations. Therefore Eustream can conclude that gas transmission corresponds with confirmed volumes. Our company transports to customers the same gas volume, which is brought to the border. Transmission system operator doesn´t have reason to examine the reasons of fluctuation in gas volumes nominated by its customers. Transmission volumes depend on the relations of suppliers and customers (shippers).

02.09.2014

Vojany-Užhorod pipeline was put into commercial operation

High representative of the European union Klaus-Dieter Borchardt together with Slovak PM Robert Fico and Ukrainian PM Arseniy Yatsenyuk inaugurated Vojany-Uzhorod pipeline. Symbolic turning the valve for the first time in history started reverse gas flow from Slovakia to Ukraine.

14.08.2014

Announcement of a start of testing period for the Vojany–Uzhorod pipeline

Eustream announces that from 16th August 2014 will start the testing phase for the Vojany–Uzhorod pipeline. The testing operation will comprise gradually build-up phase, verification and reliability checks. During this phase the interruptible capacity will be offered. After the finalization of testing operation at the beginning of September 2014 the normal commercial operation might start.